Work Day - Saturday March 26th 2011 We plan to meet by Slipper Mill at 9.30am and attend to gabion filling, tidying Dolphin Creek and Pruning on the East Bank. Please wear suitable clothing and bring tools for the tasks. A full Risk Assessment has been made - please do look at it. For more information please contact Webmaster@smppa.org.uk Gabion Filling The rock fill in several gabions has settled leaving the one above or the capping unsupported. These voids allow waves to enter further weakening the bank's integrity. Please gather suitable material from the foreshore and slide it into the void areas tightly to knit them together.
Dolphin Creek Tidy up
Help is needed to reduce the height of the lump and remove any hard material.
Work here will require wellingtons and great care is needed and the bottom is difficult in places.
General: The East Bank is being invaded by brambles again and which need to be cut back to avoid their obstructing Slipper Road.
Please chop and place the debris in the poly sacks for disposal.
Protective gloves are recommended!!
Slipper Road knuckle A 'hedge trim' is needed to maintain the sight lines.
Please chop and place the debris in the poly sacks for disposal.
|
|
|